Hammer Concepts and Designs Brings Surface Finishing In-House with a Titan Blast Room

A veteran-owned and family run company, Hammer Concepts and Designs has been manufacturing drag racing components and chassis tooling since 2010.
“We built Hammer Concepts and Designs by delivering precision chassis components for racing teams,” says founder Brian Hamm. “When parts go 150mph, every weld, cut, and tolerance has to be exact.”
The company’s challenge, however, was dealing with outside blasting and coating providers and their scheduling delays. Some providers performed blasting outdoors or in partially sheltered areas, making production dependent on the weather. Others had quality issues, which were simply unacceptable to the Hammer team.
To solve these challenges, the company relocated to a new 21,500 square foot facility in Clarksville, TN. The move would allow Hammer to expand into local metal fabrication and finishing services through a new operating division, Hammer Metalworks and Coatings.
To support the expansion, and bring in-house previously outsourced services, Hammer invested in a Titan Abrasive Blast Room.
“We wanted to bring these processes under our own roof,” says Hamm. “We wanted to take advantage of profitability while resolving the challenges associated with outsourcing surface preparation.”
Maximizing space: A few simple moves
Incorporating the 15’W x 10’H x 25’L enclosure and components initially presented a space challenge. Titan’s engineers worked with the Hammer team on equipment placement to develop a layout to accommodate the blast room and its components while maintaining the company’s production flow.

To maximize space, Titan engineers installed the blast room as close to the building wall as possible; we also rotated the dust collector blower to the side of the collector, instead of to the rear.
Bi-fold doors (versus swing out doors) allow forklift access and also save significant floor space.

While Brian Hamm could have gone with a smaller room, he wanted one that would accommodate parts that are larger than what they currently fabricate – in other words, future growth.
“The size of the room we chose far exceeds what we currently need,” says Hamm. “Being a new job shop, I don’t know what’s going to come through our doors. What I didn’t want to do was immediately take us out of the running for future jobs.”
The Hammer crew was also surprised at how quickly we installed the blast room. The Titan installation team left PA on a Friday morning, arrived on site Friday mid-day – and began installation before the Hammer crew left work Friday afternoon.
They were pretty shocked when they arrived Monday morning and saw the install was almost complete. Our install crew does not mess around!

Plus, it helped that Hammer followed pre-installation guidelines – for example, ensuring the electric feed from the main building power to the blast room area / control panel was ready to go. (The media reclaim pit had been completed a couple of weeks prior.)
A great job well done on both sides!
The Hammer Metalworks and Coatings division will provide metal fabrication and finishing services for its parent business, Hammer Concepts and Designs, and to new outside customers. Visit https://hammermetalworksandcoatings.com/